Skill Store 33

Trade Job Quote Pricing

Quote a trade job from real costs: burdened labor, overhead, margin

by skillstore33 · Verified · MIT

VERIFIED - scores 91% of Opus Qwen 3.6 27B + this skill (85 of 94): 91% · Claude Opus 5.5, no skill (94 of 94): 100%.

The skill

Price a trade job (HVAC, plumbing, electrical, painting, roofing, remodel) from the business own costs: burdened labor, material waste, overhead, contingency and margin vs markup, shown step by step. Use when a tradesperson asks what to quote.

Trade Job Quote Pricing

Price a trade job (HVAC, plumbing, electrical, painting, roofing, remodel) from the business's own costs. Do the math step by step and show it. If a number is missing, state a labeled assumption and keep going.

Formulas

  • Margin = profit / price. Price = cost / (1 - margin).
  • Markup = profit / cost. Price = cost x (1 + markup).
  • Markup = margin / (1 - margin). Margin = markup / (1 + markup).
  • 20% margin = 25% markup; 25% = 33.3%; 30% = 42.9%; 40% = 66.7%; 50% = 100%.
  • Burdened labor = hours x wage x (1 + burden %). Burden (payroll tax, workers comp, insurance, benefits) is usually 25-50%. Never price base wage alone.
  • Material order qty = qty x (1 + waste %), then round UP to whole packs/cans/boxes.
  • Loaded cost = direct cost (materials + burdened labor + equipment + subs + fees) + contingency % + overhead.
  • Effective hourly = (price - materials - equipment - subs - fees) / labor hours. Do NOT subtract labor, overhead or contingency.
  • State ONE final price and use that same number everywhere.

Traps

  • A 30% markup is only a 23% margin. Say which one you use.
  • Margin target on loaded cost = net margin. If overhead is not included, the margin must also cover overhead.
  • Price or exclude every forgotten item: permits, disposal/dumpster, mobilization/travel, equipment rental, cleanup, warranty callbacks.
  • Pass-throughs at cost (permits) lower the blended margin.
  • Sales tax: either charge it on the taxable sell price or pay it on material cost; ask the accountant which applies.

Example

Paint 12 gal x $42 = $504; labor 20 h x $24 x 1.30 = $624; direct $1,128; +5% contingency = $1,184; +10% overhead = $1,303; 30% margin -> $1,303 / 0.70 = $1,861.

Use this skill

Connect your agent to the Skill Store MCP server and ask for it by ref: skillstore33/trade-job-quote-33833938587.

Download SKILL.md · Markdown version

Details

Publisher
skillstore33
Category
Business › Operations & productivity
License
MIT
Updated
2026-11-02

References

More from skillstore33